A0011051 November 2014 Rev. 14 Commercial Kitchen Hoods Installation, Operation, and Maintenance Manual Save these instructions.
10Corner Hanging Angle Figure 2C PSP Hanging Angle Figure 2D
11Side View of Typical Hood Figure 3 End-to-End Hoods The following is a step-by-step procedure for installation of end-to-end ventilation hoods.
12Hanging Detail for Multiple Hood Models Hung End-to-End (Hemmed Ends) Figure 4A Hanging Detail for Multiple Hood Models Hung End-to-End (Flang
13Hood Connection Detail for Multiple Hood Models (Hemmed Ends with Trim Strip) Figure 5A Hood Connection Detail for Multiple Hood Models (Flanged
14Back-to-Back Hoods The following is a step-by-step procedure for installation of back-to-back ventilation hoods. Refer to Figures 5 and 6. 1. F
15Guidelines for Ductwork Installation Ductwork is furnished by supplier only if specified by the customer. The following information is provided a
16Installation of Hood Accessories Back Return Installation 1. Locate the assembly and unpack the product from the crate, being very careful not t
17Section View of Typical Hood with Back Return Figure 7 Back Return – Multiple Sections Figure 8
18Bolt-Together Standoff Installation 1. Unpack the standoff panels from the shipping container, being very careful not to dent or scratch the pan
19Back and Side PSP (Perforated Supply Plenum) Installation 1. Locate the assembly and unpack it from the crate, being very careful not to dent or
2
20Attachment of Side PSP Figure 11 PSP with a FBSS Configuration Figure 12 AC-PSP Installation 1. Locate the assembly and unpack it from t
214. Use 1/2” threaded rod to hang the AC-PSP. Install the threaded rod and angle that will be used to hang the assembly from the ceiling joists.
22Wrapper (Enclosure Panel) Installation 1. Unpack the wrapper panels from the shipping container, being very careful not to dent or scratch the
23 Figure 14B Rear Wall Attachment Figure 14C
24Front Corner Assembly Figure 14D Side Wall Attachment Figure 14E
25Completed Wrapper Assembly Completed Wrapper Assembly on End-to-End Hoods Figure 15
26End-panel Installation 1. Unpack the end-panel(s) from the shipping container, being very careful not to dent or scratch the panels. NOTE: Rep
27Quarter End panel Installation 1. Refer to Figure 17. 2. Follow steps 1 through 6 of the end panel Installation instructions. Quarter End pan
28Insulated End panel Installation 1. Refer to Figure 18 & 19. 2. Follow steps 1 through 6 of the end-panel Installation instructions. Insula
29Vertical End panel Installation 1. Refer to Figure 20. 2. Follow steps 1 & 2 of the end-panel Installation instructions. 3. Position the e
3 TABLE OF CONTENTS WARRANTY ...
30 Backsplash Installation 1. Unpack the backsplash panels from the shipping container, being very careful not to dent or scratch the outer surfac
31Insulated Backsplash Installation 1. Follow steps 1 through 3 of the Backsplash Installation instructions. 2. Slide the top flange behind the l
32 Pizza Oven Top Mount Flange Installation 1. Thoroughly inspect hood for damage including Pizza Oven Top Mount Flanges. 2. Carefully unpack hoo
33Performance Evaluation A performance evaluation of the system can be performed only after all of the following items have been verified: 1. All f
34Using a Shortridge Instrument The Shortridge is a sophisticated instrument that, with its built-in features, is basically a self contained test an
35 If both the length and width are measured in inches, use the following formula: Area (ft²) = Length (in) x Width (in) / 144 2. Record velocity
36Adjustments 1. A hood with multiple risers should be balanced according to the cooking load beneath it. For example, if a hood with multiple rise
37Troubleshooting The following table lists causes and corrective actions for possible problems with exhaust hoods. Review this list prior to consu
38MAINTENANCE To guarantee trouble free operation of this hood, the manufacturer suggests following these guidelines. Most problems associated with
4 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months
A0011051 November 2014 Rev. 14 40 Start-Up and Maintenance Documentation START-UP AND MEASUREMENTS SHOULD BE PERFORMED AFTER THE SYSTEM HAS BEEN AIR B
5LISTINGS This hood is ETL-listed to standard UL710 when installed in accordance with these installation instructions and National Fire Protection A
6Clearance Reduction Methods • • • • The hood may be installed with a 0 inch clearance to combustible materials per ETL if constructed in one of the
7Installation of a Single Hood (Wall or Island) The following is a step-by-step procedure for installation of the ventilation hood. 1. Uncrate th
88. Use 1/2” threaded rod to hang hoods. Drill 9/16” holes in the structural support system or use Unistrut® to line up with the welded-on angle m
9Basic Hanging Angle Figure 2A Full Length Hanging Angle Figure 2B