Seitenansicht 0
A0011051
November 2014 Rev. 14
Commercial Kitchen Hoods
Installation, Operation, and Maintenance Manual
Save these instructions
. This document is the property of the owner of this equipment and is
required for future maintenance. Leave this document with the owner when installation or service
is complete.
Upon receiving unit, check for any interior and exterior damage, and if found, report it
immediately to the carrier. Also check that all accessory items are accounted for and are
damage free.
WARNING!!
Installation of this unit should only be performed by a qualified professional who has read and
understands these instructions and is familiar with proper safety precautions. Read this manual
thoroughly before installing or servicing this equipment.
Seitenansicht 0
1 2 3 4 5 6 ... 39 40

Inhaltsverzeichnis

Seite 1 - November 2014 Rev. 14

A0011051 November 2014 Rev. 14 Commercial Kitchen Hoods Installation, Operation, and Maintenance Manual Save these instructions.

Seite 2

10Corner Hanging Angle Figure 2C PSP Hanging Angle Figure 2D

Seite 3 - TABLE OF CONTENTS

11Side View of Typical Hood Figure 3 End-to-End Hoods The following is a step-by-step procedure for installation of end-to-end ventilation hoods.

Seite 4 - WARRANTY

12Hanging Detail for Multiple Hood Models Hung End-to-End (Hemmed Ends) Figure 4A Hanging Detail for Multiple Hood Models Hung End-to-End (Flang

Seite 5 - INSTALLATION

13Hood Connection Detail for Multiple Hood Models (Hemmed Ends with Trim Strip) Figure 5A Hood Connection Detail for Multiple Hood Models (Flanged

Seite 6 - Clearance Reduction Methods

14Back-to-Back Hoods The following is a step-by-step procedure for installation of back-to-back ventilation hoods. Refer to Figures 5 and 6. 1. F

Seite 7

15Guidelines for Ductwork Installation Ductwork is furnished by supplier only if specified by the customer. The following information is provided a

Seite 8

16Installation of Hood Accessories Back Return Installation 1. Locate the assembly and unpack the product from the crate, being very careful not t

Seite 9 - Full Length Hanging Angle

17Section View of Typical Hood with Back Return Figure 7 Back Return – Multiple Sections Figure 8

Seite 10 - PSP Hanging Angle

18Bolt-Together Standoff Installation 1. Unpack the standoff panels from the shipping container, being very careful not to dent or scratch the pan

Seite 11 - End-to-End Hoods

19Back and Side PSP (Perforated Supply Plenum) Installation 1. Locate the assembly and unpack it from the crate, being very careful not to dent or

Seite 13 - Figure 5B

20Attachment of Side PSP Figure 11 PSP with a FBSS Configuration Figure 12 AC-PSP Installation 1. Locate the assembly and unpack it from t

Seite 14 - Back-to-Back Hoods

214. Use 1/2” threaded rod to hang the AC-PSP. Install the threaded rod and angle that will be used to hang the assembly from the ceiling joists.

Seite 15

22Wrapper (Enclosure Panel) Installation 1. Unpack the wrapper panels from the shipping container, being very careful not to dent or scratch the

Seite 16 - Back Return Installation

23 Figure 14B Rear Wall Attachment Figure 14C

Seite 17

24Front Corner Assembly Figure 14D Side Wall Attachment Figure 14E

Seite 18

25Completed Wrapper Assembly Completed Wrapper Assembly on End-to-End Hoods Figure 15

Seite 19

26End-panel Installation 1. Unpack the end-panel(s) from the shipping container, being very careful not to dent or scratch the panels. NOTE: Rep

Seite 20

27Quarter End panel Installation 1. Refer to Figure 17. 2. Follow steps 1 through 6 of the end panel Installation instructions. Quarter End pan

Seite 21

28Insulated End panel Installation 1. Refer to Figure 18 & 19. 2. Follow steps 1 through 6 of the end-panel Installation instructions. Insula

Seite 22

29Vertical End panel Installation 1. Refer to Figure 20. 2. Follow steps 1 & 2 of the end-panel Installation instructions. 3. Position the e

Seite 23

3 TABLE OF CONTENTS WARRANTY ...

Seite 24

30 Backsplash Installation 1. Unpack the backsplash panels from the shipping container, being very careful not to dent or scratch the outer surfac

Seite 25

31Insulated Backsplash Installation 1. Follow steps 1 through 3 of the Backsplash Installation instructions. 2. Slide the top flange behind the l

Seite 26

32 Pizza Oven Top Mount Flange Installation 1. Thoroughly inspect hood for damage including Pizza Oven Top Mount Flanges. 2. Carefully unpack hoo

Seite 27

33Performance Evaluation A performance evaluation of the system can be performed only after all of the following items have been verified: 1. All f

Seite 28

34Using a Shortridge Instrument The Shortridge is a sophisticated instrument that, with its built-in features, is basically a self contained test an

Seite 29

35 If both the length and width are measured in inches, use the following formula: Area (ft²) = Length (in) x Width (in) / 144 2. Record velocity

Seite 30

36Adjustments 1. A hood with multiple risers should be balanced according to the cooking load beneath it. For example, if a hood with multiple rise

Seite 31

37Troubleshooting The following table lists causes and corrective actions for possible problems with exhaust hoods. Review this list prior to consu

Seite 32 - OPERATION

38MAINTENANCE To guarantee trouble free operation of this hood, the manufacturer suggests following these guidelines. Most problems associated with

Seite 34

4 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months

Seite 35

A0011051 November 2014 Rev. 14 40 Start-Up and Maintenance Documentation START-UP AND MEASUREMENTS SHOULD BE PERFORMED AFTER THE SYSTEM HAS BEEN AIR B

Seite 36 - Conclusion

5LISTINGS This hood is ETL-listed to standard UL710 when installed in accordance with these installation instructions and National Fire Protection A

Seite 37 - Troubleshooting

6Clearance Reduction Methods • • • • The hood may be installed with a 0 inch clearance to combustible materials per ETL if constructed in one of the

Seite 38 - CAUTION

7Installation of a Single Hood (Wall or Island) The following is a step-by-step procedure for installation of the ventilation hood. 1. Uncrate th

Seite 39

88. Use 1/2” threaded rod to hang hoods. Drill 9/16” holes in the structural support system or use Unistrut® to line up with the welded-on angle m

Seite 40

9Basic Hanging Angle Figure 2A Full Length Hanging Angle Figure 2B